NEWS >
construction plastic formwork technique and safe operation

Below is the key points about construction plastic formwork  technique and safe operation:

1.Please avoid the peak of the heat when matching the mold. Then the finish after demoulding will be better.

2.Please place the PP construction plastic formwork  as flat to prevent it from deformation after demoulding .

3.Please train your workers when using PP construction plastic formwork the first time.

4.Same use as wooden template , construction plastic formwork  reinforcement direction with batten direction placed in cross shaped.

5. No need to smear the mold release agent before using templates.

6.When cast-in-place the flat plate, spacing between the keels should be 20 ~ 25 cm, and the spacing between the wall plate and keel should be 10 ~ 20 cm.

7. The seam-line between construction plastic formwork  should be taped.

8.The length of nail should not be too long, generally about 30 ~ 35 mm.

9.The strength to drive nails should be moderate.

10.When removing the formwork, should start from the small part of one end, the support and the plates should be removed at the same time aiming at preventing the template widespread drops, don’t let the corner drop on the ground vertically.

11. The template accesses to be mixed used with wood veneer, bamboo veneer and other material plate.