Please note below details when you use Beizhu plastic concrete formwork in first time.

Below are the key points about construction technique and safe operation:

1.Please use tungsten steel saw blade with over 80 meshes when you cutting the plastic concrete formwork.
2.The space between wood beams for a column should be not more than 100mm; the space between wood beams for a shear wall should be not more than 130mm; the space between wood beams for a roof should be not more than 200mm.
3.Please avoid the peak of the heat when matching the plastic concrete formwork. Then the effect of demoulding is better.
4.When matching mould for column, beam and balcony, please use package pressure process.
5.Please place the plastic concrete formwork as flat as plywood formwork prevent the deformation after releasing the mould.
6.Please have your building workers skill trained when you use plastic concrete formwork first time. This is an essential part.
7.We have both with or without flame-resistant PP formwork. And the price is different. 

Any professional details, please contact us, we work 24h for you.

Email: beizhu02@beizhugroup.com             skype: bzradiator

whatsapp: +86-13403439662                   

Facebook: https://www.facebook.com/gao.corrina.5

Youtube: https://www.youtube.com/watch?v=l-hZUhfpxAE

a 
Email To Beizhu Plastic Formwork