FAQ >
Construction technique and safe operation

1.Please avoid the peak of the heat when matching the mold. Then the finish after demoulding will be better.

2.Please place the PP formwork as flat to prevent it from deformation after demoulding .

3.Please train your workers when using PP formwork the first time.

4.Same use as wooden template , hollow plastic template reinforcement direction with batten direction placed in cross shaped.

5.No need to smear the mold release agent before using templates.

6.When cast-in-place the flat plate, spacing between the keels should be 20 ~ 25 cm, and the spacing between the wall plate and keel should be 10 ~ 20 cm.

7. The seam-line between templates should be taped.

8.The length of nail should not be too long, generally about 30 ~ 35 mm.

9.The strength to drive nails should be moderate.

10.When removing the formwork, should start from the small part of one end, the support and the plates should be removed at the same time aiming at preventing the template widespread drops, don’t let the corner drop on the ground vertically.

11. The template accesses to be mixed used with wood veneer, bamboo veneer and other material plate.

a 
Email To Beizhu Plastic Formwork